Waterneer at a Textile Mill

Problem Description:
A textile unit struggling to meet the pollution norms as it’s discharging Hexavalent chromium beyond permissible limits during certain production runs.

Customer Expectation:
Customer is short on space and requires a 5M3/hr machine to run in shifts.

Waterneer Solution and the Results:
Waterneer has successfully conducted jar tests and prepossessing the best suited solution to the customer.

By |March 28th, 2016|India, References|0 Comments

Waterneer at Corn Wet Milling Factory

Problem Description:
A leading Corn Wet Milling/ Starch unit with a capacity of 4MLD unable to meet the pollution norms.

Customer Expectation:
Customer asked for a paid pilot of 3 weeks to assess the efficiency of the Waterneer machine in comparison to the conventional ETP spread over a large area. Their expectation from Waterneer Machine was to lower […]

By |March 28th, 2016|India, References|0 Comments

Waterneer at Central Effluent Treatment Plant

Problem Description:
The CETP serves 120 different factories e.g. (automobile shops, plating units, various different factories). The customer was having concerns in removing indigo color which was being discharged from a printing unit.

Customer Expectation:
Wanted the mobile machine for a period of 3 months while the printing unit ran its production with this particular color.Waterneer Solution and […]

By |March 28th, 2016|India, References|0 Comments

Waterneer at the Engineering College

Problem Description:
The college has 1500 plus students with its own canteen and hostels in the premises. Raw untreated sewerage is being discharged in the sewage lines currently.

Customer Expectation:
The College Board wanted the Waterneer machine to run a pilot and showcase recycling of the clarified water for gardening use.

Waterneer Solution and the Results:
Waterneer machine conducted the […]

By |March 28th, 2016|India, References|0 Comments

Waterneer at Health Food Manufacturer

Problem Description:
It is a food processing industry manufacturing various malt based drinks. During their quarterly shut-down and cleaning-up process there was heavy discharge of TSS that was fouling the membrane.

Customer Expectation:
Wanted the machine for a period of 2 weeks while the cleaning/shut–down process was going on.Waterneer Solution and the Results:
Waterneer machine was clarifying the influent […]

By |March 28th, 2016|India, References|0 Comments

Waterneer at Central Effluent Treatment Plant, INDIA

Problem Description:
The CETP clarification tank was being desilted and raw effluent could not be sent for further tertiary treatment.

Customer Expectation:
Wanted the mobile machine for a period of 2 months while the maintenance work was being carried out at the CETP.Waterneer Solution and the Results:
Waterneer machine was clarifying 0.5MLD influent successfully and occupying a space of […]

By |March 28th, 2016|India, References|0 Comments

Waterneer at a Sewage Pumping Station, INDIA

Problem Description:
The pumping station run by the Municipal Corporation was discharging raw sewage in the underground sewage line; however, the Pollution Control Authorities passed an order for the Municipal Corporation to clarify the sewage.

Customer Expectation:
The Municipal Authorities invited Waterneer to run a 4 week pilot.Waterneer Solution and the Results:
Waterneer machine was clarifying 0.5 MLD sewage […]

By |March 28th, 2016|India, References|0 Comments