References

/References
­

Waterneer at Stena Metall – Stena, Sweden

Problem Description:
A metal recycling plant had open air storage of various junk, equipment and scrap metal parts. The rain water picked up contamination from the junk and needed processing for safe discharge into the natural water body

Customer Expectation:
Treat the contaminated water and stay within the environmental limitsWaterneer Solution and the Results:
The source had variable […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer at Ragn-Sells – Stockholm, Sweden

Problem Description:
Effluent from multiple factories was collected in a sedimentation pond which was very smelly and needed cleanup

Customer Expectation:
Clean up the pond and discharge the water to a natural water body meeting the environmental regulationsWaterneer Solution and the Results:
Waterneer machine started pumping the waste from the bottom through a submersible pump. The waste had […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer at Boliden Skelleftea – Boliden Zinc Mine, Sweden

Problem Description:
During heavy rain in summer and heavy snow in winter, the mine was flooded. Needed cleanup and safe discharge of effluent water.

Customer Expectation:
Cleanup the polluted waste in the mine and discharge the water meeting the environmental limitsWaterneer Solution and the Results:
Sometimes the mine accumulated 50 meters deep water at the bottom. Waterneer worked […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer at UPM Kymmene Paper Mill – Pietarsaari, Finland

Time period six months treated and clarified 380,000 M3 of sludge and water without any production disruption.Problem Description:
The holding basin/pond for the waste discharge from the paper mill was almost full and they were not allowed to discharge into the natural stream.

Customer Expectation:
Clean up the pond and meet the environmental limitations.Waterneer Solution and the […]

By |January 17th, 2016|Finland, References|0 Comments

Waterneer Cleaning Dirty Water Body — Sweden

Problem Description:
Cleaning a highly polluted Harbor of Vasteras in Sweden for a Demonstration for SECORA AS. Oslo, Norway

Customer Expectation:
Wanted to be environmentally friendly and meet the clean water requirements

Waterneer Solution and the Results:
Submerged pump was used to pull the heavy polluted sediments from the bottom. The clean water was discharged into the basin and […]

By |January 17th, 2016|References, Sweden|0 Comments