Waterneer at Gothenburg Harbor Cleanup, -Sweden

Problem Description:
Cleaning the harbor waste from the feeding pipe to the cooling tower of a gasoline powered power plant. The plant is used only for backup and emergency standby operation.

Customer Expectation:
Cleanup of the water inlet pipe.Waterneer Solution and the Results:
Divers pumped the bottom sediments of the harbor into the Waterneer machine. The slurry waste […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer at Vordingburg Harbor – Denmark

Problem Description:
Cleaning a highly polluted Harbor sediment and trial on Salt water

Customer Expectation:
Wanted to test the Waterneer machine in dirty Salt water.Waterneer Solution and the Results:
The debris from bottom of the harbor was lifted to a boat with the help of a digger and Waterneer pumped the debris to the machine. The sludge was […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer at Blenta Chicken farms, Malmo, Sweden

Waterneer had continuous operation for 60 Farms for one year on a round robin system. The machine moves from farm to farm cleaning the farm Waste – recovering recyclable wash water and sending the sludge, highly productive bio-fertilizer to the Farmers. The customer is taking full advantage of the Mobility of Waterneer machine and the […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer at Stena Metall – Stena, Sweden

Problem Description:
A metal recycling plant had open air storage of various junk, equipment and scrap metal parts. The rain water picked up contamination from the junk and needed processing for safe discharge into the natural water body

Customer Expectation:
Treat the contaminated water and stay within the environmental limitsWaterneer Solution and the Results:
The source had variable […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer at Ragn-Sells – Stockholm, Sweden

Problem Description:
Effluent from multiple factories was collected in a sedimentation pond which was very smelly and needed cleanup

Customer Expectation:
Clean up the pond and discharge the water to a natural water body meeting the environmental regulationsWaterneer Solution and the Results:
Waterneer machine started pumping the waste from the bottom through a submersible pump. The waste had […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer at Boliden Skelleftea – Boliden Zinc Mine, Sweden

Problem Description:
During heavy rain in summer and heavy snow in winter, the mine was flooded. Needed cleanup and safe discharge of effluent water.

Customer Expectation:
Cleanup the polluted waste in the mine and discharge the water meeting the environmental limitsWaterneer Solution and the Results:
Sometimes the mine accumulated 50 meters deep water at the bottom. Waterneer worked […]

By |January 17th, 2016|References, Sweden|0 Comments

Waterneer Cleaning Dirty Water Body — Sweden

Problem Description:
Cleaning a highly polluted Harbor of Vasteras in Sweden for a Demonstration for SECORA AS. Oslo, Norway

Customer Expectation:
Wanted to be environmentally friendly and meet the clean water requirements

Waterneer Solution and the Results:
Submerged pump was used to pull the heavy polluted sediments from the bottom. The clean water was discharged into the basin and […]